I ain't a B body guy but I have to drop the st column aways so the dash has room to come forward & up and out & place a rag on the col to protect its paint during the R&R. undo the bolts that hold the column to the underside of the dash (support the column) and first loosen the 3 bolts on the floorboard toe plate so the col has room to move WO binding anything. #1 With electrical the first step is always pull a batt cable off of its post. take off the nuts for the red and black ammeter main wires and CAREFULLY pry the black round connector EVENLY off of the pins on the printed circuit board and there will be some fold over tabs that secure the looms along its route


live every 24 hour block of time like it's your last day on earth