Well today its unofficially done... I got my final inspections done on the building and the electrical ... but like I said its done to them... now I can do the other things I want to do... tomorrow I'll epoxy the floor then build the office/clean room then move the equipment back in...... I'm a happy camper today
Last edited by MR_P_BODY; 09/08/09 10:40 AM.
|
|
|
Re: Shop is Unofficially Done
[Re: BBR]
#458945
09/04/09 12:11 PM
09/04/09 12:11 PM
|
Joined: Jun 2003
Posts: 52,972 Romeo MI
MR_P_BODY
OP
Master
|
OP
Master
Joined: Jun 2003
Posts: 52,972
Romeo MI
|
Quote:
pics pics pics
I'll get the wife to take some pics today(will post them later) Was funny..... I forgot to pull the electrical permit so I have to go to town today and pay for the permit which is already finalized
|
|
|
Re: Shop is Unofficially Done
[Re: MR_P_BODY]
#458947
09/04/09 03:46 PM
09/04/09 03:46 PM
|
Joined: Jan 2003
Posts: 25,877 Rio Linda, CA
John_Kunkel
Too Many Posts
|
Too Many Posts
Joined: Jan 2003
Posts: 25,877
Rio Linda, CA
|
Silly man....shops are never "done" really, you'll always be making changes.
The INTERNET, the MISinformation superhighway
|
|
|
Re: Shop is Unofficially Done
[Re: John_Kunkel]
#458948
09/04/09 03:54 PM
09/04/09 03:54 PM
|
Joined: Jun 2003
Posts: 52,972 Romeo MI
MR_P_BODY
OP
Master
|
OP
Master
Joined: Jun 2003
Posts: 52,972
Romeo MI
|
Quote:
Silly man....shops are never "done" really, you'll always be making changes.
You are correct.... but now the legal people are out of the picture.... the electrical permit is based on how many circuits you are putting in.... I got the minimum, now I can expand
|
|
|
Re: Shop is Unofficially Done
[Re: MR_P_BODY]
#458949
09/04/09 04:53 PM
09/04/09 04:53 PM
|
Joined: Apr 2004
Posts: 12,339 somwhere
smokinwoody
I Live Here
|
I Live Here
Joined: Apr 2004
Posts: 12,339
somwhere
|
Quote:
Quote:
Silly man....shops are never "done" really, you'll always be making changes.
You are correct.... but now the legal people are out of the picture.... the electrical permit is based on how many circuits you are putting in.... I got the minimum, now I can expand
go baby go...can never have enough branch circuits..
|
|
|
Re: Shop is Unofficially Done
[Re: smokinwoody]
#458950
09/04/09 06:11 PM
09/04/09 06:11 PM
|
Joined: Nov 2004
Posts: 4,330 Lynchburg, VA
Leon441
master
|
master
Joined: Nov 2004
Posts: 4,330
Lynchburg, VA
|
I'm glad an issue was brought up. I need to look at the Electrical Permit on my build. Just got the roof finished today. Need to order doors. Was going to start running conduit tommorow.
Career best 8.02 @ 169 at 3050# and 10" tires small block power.
|
|
|
Re: Shop is Unofficially Done
[Re: Leon441]
#458951
09/04/09 06:24 PM
09/04/09 06:24 PM
|
Joined: Jun 2003
Posts: 52,972 Romeo MI
MR_P_BODY
OP
Master
|
OP
Master
Joined: Jun 2003
Posts: 52,972
Romeo MI
|
Quote:
I'm glad an issue was brought up. I need to look at the Electrical Permit on my build. Just got the roof finished today. Need to order doors. Was going to start running conduit tommorow.
I used BX (I think its called) 12-3 with ground, its 4 wires in the flexible conduit.... I got a 250' roll from Home Depot for about $170 then you need the connector ends (clamps to the conduit to connect to the boxes) to me thats the only way to go on a steel building. This wire can be used on your 110 circuits or 220. Rick Ross on the board here helped me big time with the questions I had
|
|
|
Re: Shop is Unofficially Done
[Re: Leon441]
#458952
09/04/09 06:24 PM
09/04/09 06:24 PM
|
Joined: Jan 2007
Posts: 3,695 nc
emarine01
master
|
master
Joined: Jan 2007
Posts: 3,695
nc
|
|
|
|
Re: Shop is Unofficially Done
[Re: MR_P_BODY]
#458953
09/04/09 06:51 PM
09/04/09 06:51 PM
|
Joined: Jan 2003
Posts: 6,531 Jacksonville, FL
Chris2581
master
|
master
Joined: Jan 2003
Posts: 6,531
Jacksonville, FL
|
That's the same wire I used....metal building here as well.
Nautilus Racing- We use Superformance gaskets and Turbo Action converters/products.
|
|
|
Re: Shop is Unofficially Done
[Re: slantzilla]
#458955
09/04/09 07:04 PM
09/04/09 07:04 PM
|
Joined: Oct 2003
Posts: 21,345 Marysville, O-H-I-O
70Cuda383
Too Many Posts
|
Too Many Posts
Joined: Oct 2003
Posts: 21,345
Marysville, O-H-I-O
|
you're putting epoxy on the floors already? or should I ask, how long ago did they pour it?
my floor was poured a week ago yesterday, but the epoxy stuff I've looked into says to let it cure between 30-60 days before putting it down.
my building was just "finished" today, minus the final inspection, they began the site prep the first week of August, so total construction time was right at 1 month.
I'll have to check later on the electrical permit, I think mine is $40 flat fee, regardless of how many circuts or how many amps I'm running out there. but, that's a totally separate permit process than the building, so I can get the building finalized, and then go back (in the spring most likely) to do the electrical...trying to spread costs out some
**Photobucket sucks**
|
|
|
Re: Shop is Unofficially Done
[Re: 70Cuda383]
#458956
09/04/09 07:17 PM
09/04/09 07:17 PM
|
Joined: Jun 2003
Posts: 52,972 Romeo MI
MR_P_BODY
OP
Master
|
OP
Master
Joined: Jun 2003
Posts: 52,972
Romeo MI
|
Quote:
you're putting epoxy on the floors already? or should I ask, how long ago did they pour it?
my floor was poured a week ago yesterday, but the epoxy stuff I've looked into says to let it cure between 30-60 days before putting it down.
my building was just "finished" today, minus the final inspection, they began the site prep the first week of August, so total construction time was right at 1 month.
I'll have to check later on the electrical permit, I think mine is $40 flat fee, regardless of how many circuts or how many amps I'm running out there. but, that's a totally separate permit process than the building, so I can get the building finalized, and then go back (in the spring most likely) to do the electrical...trying to spread costs out some
My concrete has been down almost 3 months now... so tomorrow is epoxy day plus I'm putting some graphics on the floor on the silver gray color then a clear coat on the whole thing
|
|
|
|
|