There was a three phase service, and a single phase service. The three-phase was used for the convenience store coolers and for the 25 hp carwash pump, maybe other stuff too. I don't need any three-phase, that is all going to be abandoned. Single phase is enough to run lights, furnace, air conditioner, and well. They also had an off-peak electric water heater that had its own meter and panel.. I don't know if I want to fiddle around with the off-peak, or just wire up to the regular panel.
The building was built in about 83, so it's not like I have a bunch of old most chewed cloth covered knob and tube stuff. I just need to sort it out and figure out what I'm going to use and what to abandon. Thanks for all your help guys