Quote:

Quote:


Lynch Rd. 1969 assembled ~1,000 cars per day




Does this figure include the 1970 models also?
I have a Lynch Road built '70 Bee with a vin of 101190. That would be in the first week of '70 model production if I calculated correctly. Would this be right?
Thanks




The first (usually August) & last (usually July) months of production were not as efficient as the remaining months, so those days/weeks have much lower production numbers.

Lynch Rd. 1970 assembled ~750 cars per day
Lynch Rd. 1971 assembled ~500 cars per day (did they cut production to one shift, or did UAW strikes account for the drop in numbers??)