I have always used heat to try to save the upper arm, I'd say about 25% of the time the arm needs to be replaced from too much corrosion and damage from removing the old ball joint.

I have a heavy steel table bolted to the floor with a big ole vise bolted to it for these times, your gonna need the same imo.