There is about 3"-4" of drip rail that is attached to the quarter panel and will need to be separated from the quarter panel to do it in a factory manner. Otherwise you can take a cutoff wheel and slice the quarter panel along the drip rail edge and weld along there when installing the new panel. Once the weld is ground smooth, the Heavy Drip Check Sealer from 3M can be applied to make it look factory again.