What's the average K frame lead time before the SPD of a vehicle,Im considering a K frame with a date code of 3280 Nov.24 1970 for my 71 GTX with SPD 1/26,thats aprox.2 months lead time,is that too much or is it possible.

Last edited by 71GTX471; 05/08/21 09:39 AM.