Originally Posted by autoxcuda
Originally Posted by 5thAve
Will they let you only bring single phase into the building like you want? If the panels and distribution that's in there now is 3 phase it'll need to be replaced with single phase and that's probably something they would want to see done by an electrician. You might be better off getting an electrician to trace whatever you want at the same time. It does't take them that long and even if they label stuff and you can remove what you don't want yourself the time saved would probably be worth it.


It’s sounds like there were 3 meters

1 phase
1 phase “off peak”
3 phase

He just wants to use the 1 phase.


He didn't know what else is on 3 phase. My point is that if anything still needed is hooked up to 3 phase panel either the panel will need to be replaced or the stuff re-wired to a single phase panel already there. Which is a also good idea to replace those panels either way when it's that old and don't know what's been done to it over the years.