I'm putting together a 69 Satellite with souped up 383 and a 4 speed.
I've read that the drive shaft length for that car is supposed to be 51.50 inches to centerline of 7290 yokes.
I have one from a 65 Coronet that is 52 inches to center line of the 7290 yokes.
I'm thinking I can use it for my project.
What do you drive line experts think?