If a rotating assembly was previously balanced and one or a combo of the following was performed does the rotating assembly need to be re-balanced?

Recondition connecting rods
Replace pistons rings
Replace rod bearings
Polish crankshaft

Is there a general guideline of when a rebalance should take place?