i originally planned to go with M&aha but when I called Year One they told me a minimum of 4-6 months lead time because M&H had been changing some tooling at their factory and was very far behind. I didn't really want to wait that long so I went with Evans. I think I can make this work but may require a few modifications to the setup to get what I need. Also, I will check all crimps and connections to verify they are solid as shown in the previous post

Later tonight I will try to determine what each wire is and see what mods will need to be done.