Quote:

10/08 (1008) - date on bottom of window sticker WHAT DOES THIS DATE REPRESENT?
10/15 (A15) - "scheduled production date"
10/23 - car was still at plant




Well if the letter after the date is the plant code and the 2 digit number is a routing code, could it be the date its scheduled to be loaded up to be transported to the dealer I always assumed that car was produced early

Last edited by moparwizard; 03/03/15 03:23 PM.