Quote:

you're putting epoxy on the floors already? or should I ask, how long ago did they pour it?

my floor was poured a week ago yesterday, but the epoxy stuff I've looked into says to let it cure between 30-60 days before putting it down.

my building was just "finished" today, minus the final inspection, they began the site prep the first week of August, so total construction time was right at 1 month.

I'll have to check later on the electrical permit, I think mine is $40 flat fee, regardless of how many circuts or how many amps I'm running out there. but, that's a totally separate permit process than the building, so I can get the building finalized, and then go back (in the spring most likely) to do the electrical...trying to spread costs out some




My concrete has been down almost 3 months now...
so tomorrow is epoxy day plus I'm putting some graphics
on the floor on the silver gray color then a clear
coat on the whole thing