It has to be a logistical nightmare as the battery tech keeps advancing. This much battery = this much payload at this much distance. I always wondered if locomotive tech would be more efficient. Run a small diesel gen. to charge the batteries or run the electric motors. I've ran those towable, 220V generators on the job 10-12 hours on 5 gallons with 30-40 guys plugged into the tem-power boxes...