Performance Only, Your block is getting close, see attachments. Should be ready to ship in about 2 weeks or less. Main studs and Caps will be installed today to get the block ready for the 4th op on the CNC machine, main line and cam line final machining. There are a couple that are just ahead of yours going through the same process. Sleeves are in process to be installed after the 4th op and then semi finished as per your order form. If you would like more of a detailed up-date please give me a call and I will go over it with you.

7452860-PerfOnly1.JPG (1172 downloads)