K frame lead time before SPD
#2919913
05/08/21 09:39 AM
05/08/21 09:39 AM
|
Joined: Jan 2003
Posts: 1,893 Harriman NY
71GTX471
OP
top fuel
|
OP
top fuel
Joined: Jan 2003
Posts: 1,893
Harriman NY
|
What's the average K frame lead time before the SPD of a vehicle,Im considering a K frame with a date code of 3280 Nov.24 1970 for my 71 GTX with SPD 1/26,thats aprox.2 months lead time,is that too much or is it possible.
Last edited by 71GTX471; 05/08/21 09:39 AM.
|
|
|
Re: K frame lead time before SPD
[Re: A12]
#2920672
05/10/21 10:08 AM
05/10/21 10:08 AM
|
Joined: Jan 2003
Posts: 17,838 S.E. Michigan
ZIPPY
I Live Here
|
I Live Here
Joined: Jan 2003
Posts: 17,838
S.E. Michigan
|
If your car is a Lynch Road Assembly (LRA) plant car then from what I've seen it's closer to one to two weeks not months. A lot of LRA cars seem to be more like a few days prior to the SPD from previous threads here. Still would like to keep that thread active. Brings up a question for me as to where (and when) the K-frames were made/assembled in the plants. Were they part of Body-In-White or that general area of the plants?
IMO two months prior to SPD is a stretch but not totally out of the question but not likely from what has been posted.................for LRA cars that is.
Mike Even though the OP doesn't have a LRA car, I do...and that comment helps me. So thanks.
Rich H.
Esse Quam Videri
|
|
|
|
|
|