What Ruderunner said: full field the alt for 5 seconds max, just long enough to take a voltage reading from alt batt stud to alt case. run it at a fast idle & have all lights/accessories off. Tho on the test I would pull both field leads & jump from batt positive post to one male alt field stud and as said ground the other male alt field stud.


live every 24 hour block of time like it's your last day on earth