Time...... i need about 36 hours in a day to get stuff done.

I just got my piece of steel back from the machinest (bored the hole for the bearing retainer), that is the beginning of my adapter plate for the 833 4-speed to the 143 tooth bellhousing. All this so i can run the magnum style flywheel fot the injection crank sensor down the road. Also need to decide if im going to sell my A-body 4speed and look for a b-body one or use my parts around here to create a B-body one (change mainshaft and tailshaft)


Outcast Dodge guy.