Moparts

Was a Good Day Working On The Shop

Posted By: MR_P_BODY

Was a Good Day Working On The Shop - 10/18/09 11:50 PM

I got my hoist all mounted and wired, got the drywall
hung on the office... still waiting for 1 part for my
boiler heating system...... HOPEFULLY I didnt drill
into any of the tubing in the floor while mounting the
hoist... dont think I did BUT you never know till I get
the 1 part, then I'll pressure test it again


Attached picture 5553185-Interior02Sml.jpg
Posted By: MR_P_BODY

Re: Was a Good Day Working On The Shop - 10/18/09 11:52 PM

hoist before I mounted it today


Attached picture 5553191-Hoist04Sml.jpg
Posted By: 340RICK

Re: Was a Good Day Working On The Shop - 10/18/09 11:58 PM

im jealous Mike that is one kool shop
Posted By: MR_P_BODY

Re: Was a Good Day Working On The Shop - 10/19/09 12:50 AM

Quote:

im jealous Mike that is one kool shop





Thanks Rick.... I wish it was bigger but this one is
costing me enough
Posted By: B1KILLER

Re: Was a Good Day Working On The Shop - 10/19/09 12:52 AM

This is really a good site, we show all kinds of builds. LOL

Attached picture 5553320-atco2.jpg
Posted By: Mopar-Al

Re: Was a Good Day Working On The Shop - 10/19/09 12:53 AM

How tall is the lift posts? I was measuring my ceiling today. Looks good
Posted By: MR_P_BODY

Re: Was a Good Day Working On The Shop - 10/19/09 01:04 AM

Quote:

How tall is the lift posts? I was measuring my ceiling today. Looks good




Its just under 9' to the top of the motor(highest point)
This one is 9000 lbs so I can lift my diesel which is
my race car hauler(now its race related... for some)
© 2024 Moparts Forums