Mods are going well. We changed the lead in angle on the 1st gear synchro. Wxcellent results. We are currently awaiting patterns for the B and E Body tailhousings. These were supposed to be done in March. So, as you can imagine, I am less than pleased. However, at this point, to go after another foundry and pattern maker, just doesn't make sense. All I can say is that we are working as quickly as possible. We are continuing testing the unit in A Body cars as we await the B and E Body tooling. I have been really beating on this and it has not failed. 685 hp, 3660 lb car. Believe me, I want this project wrapped up as soon as possible. We have a TON of money out there. I am literally STANDING on the pattern maker to get these finished so that we can have display stuff for Carlisle. We are doing our best. I would like to thank everyone for their patience on this project.
Jamie


Passon Performance 309 Turkey Path Sugarloaf, PA 18249 (570) 401 8949 www.passonperformance.com