Originally Posted By 70sixpkRT
Originally Posted By mickm
Originally Posted By JamiePasson
I have been busy trying to stay on top of stuff. As some realize that this is a job! The reason for the OSB box is we were actually having units getting broken in shipping because there was nothing to absorb the impact of the ridiculous handling of the shippers. That’s the reason and the only reason. We have shipped well over a thousand A833 units in OSB crates and I have had 2 broken. I’ll take those odds.

ALSO, we ran two runs of dual mount 70 up B/E tails and had core shift both times. That is why there is a delay on those units. We expect more tails late April


Yes, and I was one of those lucky 2! Luckily we were able to get UPS to reimburse Jamie, and I have only the highest praise for how he handled it for me!

Mick which tranny did you get? I was thinking of getting his overdrive unit.


I had him rebuild mine. I was having issues I couldn't track down, finally got tired of it, and had him fix it.