not too much to add here today. here's a picture of the clearance notch needed at the bottom of the cylinders for connecting rod clearance.
aside from that, all the bearing oil clearances are adjusted and all the mock up work is done. one last cleaning and then the final assembly begins.

Last edited by Performance Only; 08/24/12 10:02 PM.

machine shop owner and engine builder