I've reached the first of many milestones in this project. The frame rebuild is complete. Since the rear bumper mounting bracket was in decent shape, I reused it. It was helpful in verifying some dimensions. I measured everything 6 ways to Sunday from many body and suspension mounting points, and its all dead nuts.





The next phase is to send the Dana 44's to the axle shop to get rebuilt, re-geared with 4.56's, Warn hubs, and locker diffs installed.